Term contract
New Engineering Contract (NEC) Option G: Term Contract, is a contract for the appointment of consultants.
It provides for the appointment of a consultant for an agreed period of time based on a priced task schedule and staff rates for different grades of staff. Prices on the task schedule are either a lump sum for that item, or may be carried out on a time basis. The consultant bears the risk of being able to perform the tasks at the agreed prices.
When the client wants the services to be carried out they are simply selected from the task schedule and the consultant is instructed.
If the client wants the consultant to carry out services that are not on the task schedule, they are notified as compensation events (similar to relevant events on other forms of contract). This will result additional payment being made, priced using the compensation event assessment procedure.
NB The Chartered Institute of Procurement & Supply (CIPS) Glossary of procurement terms, defines term contracts as: ‘Contracts written to last a period of time and include agreed terms.’
[edit] Related articles on Designing Buildings Wiki
- Appointments.
- Compensation event.
- Contract.
- NEC Option A: Priced contract with activity schedule.
- NEC Option B: Priced contract with bill of quantities.
- NEC Option C: Target contract with activity schedule.
- NEC Option D: Target contract with bill of quantities.
- NEC Option E: Cost reimbursable contract.
- NEC3.
- Procurement route.
- Relevant event.
Featured articles and news
Wellbeing in Buildings TG 10/2025
BSRIA topic guide updates.
With brief background and WELL v2™.
From studies, to books to a new project, with founder Emma Walshaw.
Types of drawings for building design
Still one of the most popular articles the A-Z of drawings.
Who, or What Does the Building Safety Act Apply To?
From compliance to competence in brief.
The remarkable story of a Highland architect.
Commissioning Responsibilities Framework BG 88/2025
BSRIA guidance on establishing clear roles and responsibilities for commissioning tasks.
An architectural movement to love or hate.
Don’t take British stone for granted
It won’t survive on supplying the heritage sector alone.
The Constructing Excellence Value Toolkit
Driving value-based decision making in construction.
Meet CIOB event in Northern Ireland
Inspiring the next generation of construction talent.
Reasons for using MVHR systems
6 reasons for a whole-house approach to ventilation.
Supplementary Planning Documents, a reminder
As used by the City of London to introduce a Retrofit first policy.
The what, how, why and when of deposit return schemes
Circular economy steps for plastic bottles and cans in England and Northern Ireland draws.
Join forces and share Building Safety knowledge in 2025
Why and how to contribute to the Building Safety Wiki.
Reporting on Payment Practices and Performance Regs
Approved amendment coming into effect 1 March 2025.